Belshaw Adamatic Mark II-Gas Donut Robot User Manual

Page 12

Advertising
background image

Belshaw Bros., Inc. www.belshaw.com

• Phone 206-322-5474 • Fax 206-322-5425

6

MN-1017EN

Donut Robot Mark II-Gas OM

WARNING

If the conveyor becomes jammed: 1. Turn

off the conveyor drive and the heater. 2.

Allow the system to cool down. HOT

SHORTENING IS DANGEROUS.

3. Determine the cause of the jamming.

4. Clear it. 5. Restart the system.

15. Continue adding shortening to the kettle to

maintain the proper shortening level (see
step 4). There are three ways to do this:
• Melt some shortening in a pan on the

stove and carefully pour it into the kettle.

• If you are using the optional EZ Melt,

transfer more shortening from it. See
your EZ Melt manual.

• If you are using the optional Shortening

Reserve Tank, push open the supply
valve.

16. Continue loading proof cloths onto the Feed

Table as needed.

17. To shut down the machine when you are

done:

a. Move the POWER switch on the control

box to the OFF position.

b. Turn the combination gas control valve

to the PILOT position. Lightly press
down the valve and turn it to the OFF
position.

Advertising