Gasboy CFN Series SCII Start-Up Manual User Manual
Page 60
Advertising

CFN Series System
7-2
03/07/03
g.
Turn off all hoses.
h.
Place the system override switch, for Hose 1 in the ON position.
i.
Repeat Steps d through h for all remaining hoses. Substitute the hose number being
tested for hose 1 until all hoses have been tested.
j.
Replace all connectors and reassemble.
Advertising
This manual is related to the following products: