Gasboy CFN Series SCII Installation Manual User Manual

Page 58

Advertising
background image

Pump/Remote Dispenser Wiring

05/28/03

4-9

TERMINAL BLOCK ID


All mechanical pump/remote dispenser wiring for the CFN System is terminated in the pump
control unit. Terminal connectors should be used on stranded wire when connecting to the pump
power and power input terminal blocks of the system. Connections made to the smaller screw
terminal blocks (Pump Control I/O PCB Assembly) do not require terminal connectors. The wire to
these connectors must not be any larger than 14 AWG. The orientation of the chassis assembly is
shown below.


Advertising