INSTALLATION

5.2

Monitor and control unit positioning

The BRAVO 400S series computer

must be placed in the control cabin of the farming machine. Observe the following precautions:

- Do NOT install the monitor in areas where it would be subjected to excessive vibrations or shocks, to prevent any damage or
accidental use of the control keys.
- Install the device in a visible position within easy reach by hand; bear in mind that the monitor should not obstruct the
operator’s freedom of movement or block his view.

• Control units (RCU): secure the control units on the back of the machine, close to the control unit and the hydraulic unit.

Consider all necessary connections of the computer (Fig. 5, Fig. 6 and Fig. 7), the cable length, and make sure there is enough
space for connectors and cables.
An identification symbol is located next to each connector to indicate its function.
For any reference to the system configuration read par. 5.1.

Fig. 5

ITEM

CONNECTION POINTS

MONITOR

1

SD memory card

2

USB (2)

3

GPS receiver

4

Cameras +

External main control

5

Connection of

monitor / switch panel

6

Control panel power supply +

RCU connection

RCU RCU

7

Control unit (G + P) +

Sensors +

Connection to hydraulic RCU

8

Seletron - Line 2

9

Seletron - Line 1

10

Monitor + power supply

RCU RCU

11

Connection to
Seletron RCU

12

Connection to

Hydraulic unit

Fig. 6

Fig. 7

MONITOR

SELETRON RCU

HYDRAULIC RCU