Ac connections (mpsl-30d and mpsh-30d models) – Magnum Energy Magnum Panel (MP Series) User Manual

Page 48

Advertising
background image

© 2011 Magnum Energy, Inc.

Page 41

3.0 Installation

IMPORTANT: AC - GROUND CONNECTION

(remove this green wire if the neutral is bonded

to ground either at the generator or grid source)

INV HOT 1 OUT
(from inverter’s
AC HOT 1 output)

INV HOT 2 OUT
(from inverter’s
AC HOT 2 output)

INV NEUTRAL OUT
(from inverter’s
AC NEUTRAL output)

AC NEUTRAL IN
(from neutral of
generator or grid)

AC LEG 1 IN
(from L1 side of
generator or grid)

AC LEG 2 IN
(from L2 side of
generator or grid)

GROUND BUSBAR

(inverter’s input and

output AC GROUND)

GROUND BUSBAR

(from generator/grid

ground and to AC

load panel ground)

O

U

TPU

T

FR
O

M

IN

VER

TER

IN

PU
T

TO

IN

VER

TER

INVERTER

GROUND

O

U

TPU

T

T

O

IN

VER

TE
R

LO
A

D

S

LOADS &

GEN/GRID

GROUND

IN

P

U

T

FR
O

M

G

E

N

/G

R

ID

INV NEUTRAL IN*

(to inverter’s

AC NEUTRAL input)

INV HOT 1 IN

(to inverter’s

AC HOT 1 input)

INV HOT 2 IN

(to inverter’s

AC HOT 2 input)

AC LEG 1 OUT

(to main breaker on L1

side in AC load panel)

AC LEG 2 OUT

(to main breaker on L2

side in AC load panel)

AC NEUTRAL OUT

(to NEUTRAL busbar

in AC load panel)

AC Connections (MPSL-30D and MPSH-30D Models)

* The INV NEUTRAL IN is not required if
MS-PAE inverters are used (the neutrals
are common in these inverters).

Figure 3-17, MPSL-30D and MPSH-30D AC Wiring Connections

Advertising