B.4 running a batch, Section b.4, Ee section b.4) – Emerson Network Router User Manual

Page 89

Advertising
background image

Installation and Use Manual

83

Configuring the Discrete Batch Application

In

de
x

Discre

te Batc

h

In

de
x

Discre

te Batc

h

In

de
x

Discre

te Batc

h

In

de
x

Discre

te Batc

h

If the Inhibit Totalizer function is mapped to a discrete input:

•

The totalizer will not increment while the discrete input is active.

•

The totalizer will resume incrementing automatically when the discrete input becomes
inactive.

•

If the discrete input is inactive, the totalizer is active, whether or not a batch is running. Even if
a batch is not running, the totals will be incremented if flow is detected.

If the batch totalizer is inhibited while a batch is running:

•

And the

No-flow timeout

batch control option (see Section B.3.2) is set to 0, no timeout alarm

will be posted.

•

And the

No-flow timeout

batch control option is set to a non-zero value, a timeout alarm will

be posted if the timeout period expires before batch totalizing resumes.

B.4

Running a batch

The ProLink II

Run Batcher

window, shown in Figure B-4, can be used for batch operation. It

provides the same functionality as the batch process screen on the transmitter display.

Figure B-4

Run Batcher window

Advertising