Amprobe Telaris-ISO-PRO Insulation-Tester User Manual

Page 15

Advertising
background image

• Ensure correct and clean contact to UUT. A bad contact to UUT may cause the interruption

of the measurement.

• The test voltage remains present at UUT until the ISO-PRO has determined the insulation

resistance value or as long as the "Start” key (20) is pressed.

• During the measurement the symbol of the measurement unit (M

Ω/GΩ) is displayed.

• If the measurement value falls below the pre-set limit value, a signal is audible after the end

of the measurement and the ""-symbol appears.

• To store the measurement result, press the "Save” key (21).
• The measurement value remains displayed until the start of a new measurement procedure

or until a different measurement range is selected.

• The UUT is automatically discharged after the measurement. During this time the symbol

of the measurement unit is blinking.

External voltage protection for insulation resistance measurement range.

If a external voltage of maximum 1200 V is connected by mistake to the insulation
measurement socket, the ISO-PRO will not be damaged.

The instrument display indicates +”UEXT". After removal of the external voltage wait for
approx. 30 seconds. Only then correct measurement results will be indicated.

13

PAEB30872322:Layout 1 02.10.2008 15:56 Uhr Seite 13

Advertising