PLANET FGSW-2402PVS User Manual

Page 12

Advertising
background image

8

# '0

! )

&

Unlike the unmanaged switch, FGSW-2402PVS/ FGSW-2620PVS performs series smart functions that make

the Switch operate more effectively. This section will describe the common usage of the Switch Smart

Configuration.

Note:

The following section will base on the console screens of FGSW-2620PVS, for

FGSW-2402PVS the display will be the same to FGSW-2620PVS.

$

%

%

3

#+

When you are ready to configure the smart functions of the Switch, make sure you had connected the supplied

RS-232 serial cable to the RS-232 port at the front panel of your Switch and your PC.

3

03

#

$

3

In Windows 98/2000/XP, launch “HyperTerminal”, create a new connection, and adjust settings as below:

Emulation: VT-100 compatible

Baud per second: 9600

Data bits: 8

Parity: None

Stop bits: 1

Flow Control: None

To get a demonstration, please see the figure 3-1.

Figure 3-1

Console Port Settings for smart functions

+ $# %

+

#

As the Switch powers on, it goes through a self-test process to ensure proper operations of the Switch

hardware. The messages will be displayed to show the test progress. When the test completes successfully,

the system will display a login screen. If any of the components fails during the test, you may need to contact

your local dealer and have the Switch replaced. Figure 3-2 shows a successful Self-test menu of the Power-up

System Self-diagnostic Process.

Advertising
This manual is related to the following products: