5 control panel – GE SG SERIES 20 User Manual

Page 20

Advertising
background image

g

GE

OPM_SGS_USM_10K_40K_0US_V010.doc

20/88 Operating

Manual

SG Series 10, 20, 30 & 40 kVA

5 CONTROL

PANEL

5.1 CONTROL

PANEL

Fig. 5.1-1 Control Panel

5.2

TABLE OF FUNCTIONS AND INDICATIONS ON CONTROL PANEL

inverter on/off

Key to switch the Inverter ON.
(This key is also used to reset total off if pressed simultaneously with total
off
push button).

inverter on/off

Key for Inverter shutdown.
Press key to transfers the Load to Utility.
Keep pressed for 5 seconds to shutdown the Inverter.
This key is also used as the EPO (Emergency Power Off) reset.

mute

Key to reset general alarm and buzzer.

test

Key to test the control panel LED’s and buzzer.
(Pressing this key causes all the LED’s to light and the buzzer to
sound 3 times).

The push-button total off is protected by a red cover.
By pressing it, you immediately separate the UPS from utility and the Load.

Attention: total off cannot disconnect the UPS from the Load with Q2
closed
.

To reset total off: push and hold the total off push-button and the I key
(inverter on) simultaneously for some seconds.

For parallel system, pressing total off on one unit connected on

parallel bus (switch Q1 closed), all the units are separated from the load.
The “total offreset must be done only on one unit connected on the parallel
bus (switch Q1 closed).

Special care must be taken in using this command, in order to
avoid accidental Load
disconnection.

Advertising
This manual is related to the following products: