GE SG SERIES 20 User Manual

Page 69

Advertising
background image

g

GE

OPM_SGS_USM_10K_40K_0US_V010.doc

69/88 Operating

Manual

SG Series 10, 20, 30 & 40 kVA

7.4.3 From Manual Bypass (Q2) to normal function On-line

Initial status: Load supplied from Manual Bypass.

All Q2 of the system closed.

First operated unit

All other units of the system

1. Connect the Battery to all Units by closing the external Battery Switch(es) or

Fuses.

2. Close Q1 (Pos. I) on all Units.

The Rectifiers will start automatically and at the closure of Q1 of the last Unit, the
Bypass of all Units will be activated.

First operated unit

All other units of the system

3. Open Q2 (Pos. O) on all Units.

First operated unit

All other units of the system

Continue

Advertising
This manual is related to the following products: