GE SG SERIES 20 User Manual

Page 24

Advertising
background image

g

GE

OPM_SGS_USM_10K_40K_0US_V010.doc

24/88 Operating

Manual

SG Series 10, 20, 30 & 40 kVA

Rectifier Utility data screen
This screen refers to the AC source supplying the Rectifier.
This screen displays:

Iout1 = output current Rectifier Bridge.

Iout2 = output current 2

nd

Rectifier Bridge (optional 12 pulse Rectifiers only).

The voltage levels between the three phases (line-to-line).

The input frequency of the Rectifier.

RECTIFIER

U12=481V Iout1 =107A
U23=480V

Iout2 = 0A

U31=482V f=60.0Hz

m etering

alarm s

param eters

+

ok

Inverter data screen
This screen displays:

The voltage level of the three phase voltages (line-to-neutral).

The output frequency of the Inverter.

The synchronization status of the Inverter with respect to Utility.

INVERTER: U1=277V
U2= 277V

U3=277V

Frequency = 60.0Hz

Synchronized

metering

alarms

parameters

+

ok

Status Load screen
This screen displays:

The Load level in kVA (for RPA: only this unit).

The Load level as a percentage of the nominal rated Load (for RPA: only this unit).

The source of the power supplied to the Load.

LOAD ON UPS

Load =

25.20kVA

Percentage = 84%

LOAD ON INVERTER

metering

alarms

parameters

+

ok

Load on phases screen 1
This screen displays for each phase:

The output phase voltage and current as RMS values (for RPA: total value of Parallel
System).

The output Load as percent (for RPA: respect to the rated power of Parallel System).

LOAD ON PHASES

U1=277V I=30A 84%
U2=277V I=26A 73%
U3=277V I=27A 76%

metering

alarms

parameters

+

ok

Advertising