GE SG SERIES 20 User Manual

Page 62

Advertising
background image

g

GE

OPM_SGS_USM_10K_40K_0US_V010.doc

62/88 Operating

Manual

SG Series 10, 20, 30 & 40 kVA

7.3.7 Restore to normal operation after “total off”

View of the panel after pressing the button total off.

All Contacts are open;

Rectifier, Inverter and Static-Switch shutdown.

First operated unit

All other units of the system

1. Reset total off by pressing and holding the “total offbutton and then the

inverter on ( I ) key, on any of the Units simultaneously, until Load is supplied
from Bypass and the Rectifiers start.

System output connects to Bypass Utility.

Rectifiers start with blinking LED.

At the end of Soft-start the LED’s remains lit.

The LCD screen

on all Units

shows LOAD ON BYPASS”.

FIRST OPERATED UNIT

All other units of the system

2. Connect the Battery to all Units by closing the external Battery Switches or

Fuses, in case of External Battery.

Continue

Advertising
This manual is related to the following products: