GE SG SERIES 20 User Manual

Page 61

Advertising
background image

g

GE

OPM_SGS_USM_10K_40K_0US_V010.doc

61/88 Operating

Manual

SG Series 10, 20, 30 & 40 kVA

3. Disconnect the Battery, in case of External Battery, from all Units.

Wait 5 minutes for DC-Link Capacitors discharge

.

First operated unit

All other units of the system

4. Disconnect the Utility supply from all Units.

All LED’s are OFF.

First operated unit

All other units of the system

End of procedure

Advertising
This manual is related to the following products: