Matsushita CF-T5LWETZ1 2 User Manual

Page 47

Advertising
background image

47

9.3.3. Assembly knowhow of the Main Board

9.3.3.1. Putting tapes for Memory Sheet of top side

9.3.3.2. Assembly of the MDC MODEM

Be sure to bond neatly for the memory heat radiation purpose material

Board slit externals match
0 1mm

There must not be running aground

Top side memory Sheet

Board slit externals match

0 1mm

Safety work

It is confirmed that top side memo-
ry Sheet does not run aground on
the switch.

Bond neatly for the memory heat
radiation purpose material

MDC PLATE Fixed treatment
device

Hits to the side

Hits to the side

10 3mm

Pattern 1

Pattern 1 Please execute either work
of or pattern 2

Washer, Sleeve A and Sleeve B

Washer, Sleeve A and Sleeve B

It is unnecessary in mk2.

It is unnecessary in mk2.

Continue and use mk1.

Continue and use mk1.

Board's edge match
0 1mm

MDC MODEM

The tape must overlap with the
shrinkage tube by 1mm or more.

Safety work

Affixes to the back
of Board

MODEM Cable

PET Tape

Hits to the treatmen
to device

Pattern 2

Washer

Sleeve A

Sleeve B

Screw

MDC PLATE

Advertising