9.3.5. Assembly knowhow of the Bottom Case

9.3.5.1. Setting Antenna Board and Line processing (1)

Places between the
Bottom Case and installs

Process Antenna Cable (L) which remained after installing Antenna Board (L)
in the Bottom Case as shown in the figure below.

DC-IN is installed in bottom

Ferrite sheet is
processed in board.
The load is not put on
the terminal of DC-IN.

Processes with the boss between ribs

Processes to the ditch
of the Bottom Case

It is confirmed that the terminal
becomes the immediate truth it below

Antenna Cable (L)

Antenna Board (L)

Boss

Bottom Case

Wiring of Antenna Cable (L)

Screw N12-2

Screw N12-1

DC-IN is installed in the Bottom Case

It is confirmed that the terminal becomes straight

Safety work

Safety work

Safety work

Safety work

DXQT2+E6FNL

DC-IN
Holder

Hook is hooked to
the Bottom Case

Hook is hooked to
the Bottom Case

The top side is closed while hooking
the hook below on the Bottom Case

Antenna Cover (L)

Assembly the Antenna Cover (L)

Antenna Cover (L) installation

completion Chart

DC-IN Holder

Installation

LCD Cable Sheet

Confirmation

It is confirmed that the terminal becomes straight, installs the DC-IN Holder, and affixation LCD Cable Fix Shee

Safety work

It is confirmed that Ferrite sheet
has been inserted under the board.

Safety work

9.3.5.2. Assenbly of the Antenna Cover (L)