Putting pet tapes – Matsushita CF-T5LWETZ1 2 User Manual

Page 48

Advertising
background image

48

9.3.3.3. Putting PET tapes

Cable’s root is surely suppressed

Screw A

Screw B

Processes on the capacitor

Processes between capacitors

The order of tightening screw :

Screw : DXQT2+D25FNL

Modem Cable must install MDC MODEM in Main Board after connects with MDC MODEM.
Do the machine screw tightening in Main Board by tightening the hand. Moreover, note that receives by the hand,
and Main Board is not curved on the other side of Main Board of the machine screw tightening part.
Solder crack prevention by Main Board spring

Tape

Affixes between DAI

Processes next to the connector

Connector connection

Processes to the CHIP set
(CHIPSETDAI(Dotted line part)
Thing that running aground is
not in capacitor)

(Attention)

Connector connection

Substrate externals match

POWER SW edge application

Execute after setting the substrate in the receiving treatment device when working.

Do not get on the
machine screw hole

Square hole

Put the Both
Side Tape

USB Cable

Main Board Sheet

PCMCIA-MAIN Sheet

Advertising