Matsushita CF-T5LWETZ1 2 User Manual

Page 51

Advertising
background image

51

Spreads on the terminal BATT
(It is one blowing to the range)

W-LAN
MODULE

< Attention >
Execute after setting the substrate in the receiving
treatment device when working.

(Attention)

Affixation load of affixation thing not instructed : More than 1kgf/c

Screw
DXQT2+D25FNL

Execute after setting the substrate in the receiving treatment device when working.

(Attention)

MEMORY HEAT Sheet and B/C Label Affixation load : More than

Seat edge match

From the terminal root

B/C Label

MEMORY HEAT Sheet

9.3.3.7. Assembly of the W-LAN Module / Putting Memory Sheet

Advertising