14 e1/t1 installation guide, 1 preparing the ptp 600 series bridge e1/t1 cable, E1/t1 installation guide – Motorola MotoWI4 PTP 600 Series User Manual

Page 193: Preparing the ptp 600 series bridge e1/t1 cable, Figure 111 - completed odu connector

Advertising
background image

191

14 E1/T1

Installation

Guide

14.1 Preparing the PTP 600 Series Bridge E1/T1 Cable

Note: The maximum cable length between the ODU and the customers terminating

equipment is 200m (656 feet) for T1.

The E1/T1 cable should be assembled to the following instructions:

Step 1: Assemble gland on cable as shown

Step 2: Strip the outer insulation

Step 3: Arrange conductors as shown in fig.

A2 and cut to length

Step 4: Insert conductors and crimp

Figure 111 - Completed ODU Connector

Advertising