3 - 54

3. SIGNALS AND WIRING

3.9 Servo motor with electromagnetic brake

CAUTION

Configure the electromagnetic brake operation circuit so that it is activated not only

by the servo amplifier signals but also by an external emergency stop signal.

EMG

RA

24VDC

Contacts must be open when
servo-off, when an trouble (ALM)
and when an electromagnetic brake
interlock (MBR).

Electromagnetic brake

Servo motor

Circuit must be
opened during
emergency stop (EMG).

The electromagnetic brake is provided for holding purpose and must not be used

for ordinary braking.

Before performing the operation, be sure to confirm that the elecromagnetic brake

operates properly.

POINT

Refer to the Servo Motor Instruction Manual for specifications such as the
power supply capacity and operation delay time of the electromagnetic
brake.

Note the following when the servo motor equipped with electromagnetic brake is used:

1) Set " 1 " in parameter No.1 to make the electromagnetic brake interlock (MBR) valid. Note

that this will make the zero speed signal (ZSP) unavailable.

2) Do not share the 24VDC interface power supply between the interface and electromagnetic

brake. Always use the power supply designed exclusively for the electromagnetic brake.

3) The brake will operate when the power (24VDC) switches off.
4) While the reset (RES) is on, the base circuit is shut off. When using the servo motor with a

vertical shaft, use the electromagnetic brake interlock (MBR).

5) Switch off the servo-on (SON) after the servo motor has stopped.

(1) Connection diagram

MBR

COM

Servo amplifier

Servo motor

B1

B2

Emergency
stop

RA

24VDC

RA

VDD

(2) Setting

1) Set " 1 " in parameter No.1 to make the electromagnetic brake interlock (MBR) valid.
2) Using parameter No. 33 (electromagnetic brake sequence output), set a time delay (Tb) at servo-off

from electromagnetic brake operation to base circuit shut-off as in the timing chart shown in (3) in
this section.