Sequence of operation flow chart – State Industries SHE50-100PE User Manual

Page 57

Advertising
background image

55

Servicing should only be performed by a Qualified Service Agent

seQuence of operation flow chart

If tank temperature drops below Operating Set Point minus

Differential setting a heating cycle is activated

Control System performs diagnostic system check

Normal State of all pressure switches and ECO are checked

Blower Prover pressure is switch verified open

All other pressure switches and ECO are verified closed

Blower Prover switch contacts confirmed

closed by Control System

Igniter is energized for warm up period

YES

24 Volt Gas Valve is energized

gas flows to Burner

Does Control System sense minimum flame sensing

of 1.0 µA (DC micro amps) through Flame Sensor?

Control System Locks Out

Displays Fault Msg

Combustion Blower is energized

Pre-Purge cycle

YES

Does Control System sense minimum

0.5 AC amps through the Igniter?

YES

Control System Locks Out

“Blower Prover Open”

Fault Msg is displayed

NO

Control System Locks Out

“Low Igniter Current”

Fault Msg is displayed

NO

YES

NO

Water is heated to

set point

24 Volt Gas Valve

de-energized

30 second

Inter-Purge cycle

24 Volt Gas Valve

de-energized

Retries up to

two more times

30 second

Post-Purge cycle

Control System Locks Out

“Ignition Failure”

Fault Msg is displayed

Control System goes

into Standby mode

NO

Advertising
This manual is related to the following products: