OPERATION

B-6

B-6

INVERTEC® STT® & STT® II

WELDING PARAMETERS AND GUIDE-
LINES

The Invertec STT II is neither a constant current (CC)
nor a constant voltage (CV) power source. In general,
wire diameter will be increased one size compared to
conventional (CV) power sources. The larger the wire
diameter the higher the deposition rate (Up to 1/16”).
Wire sizes below .035” are unnecessary for most appli-
cations. The Invertec STT II is a current controlled
machine which is capable of changing the electrode
current quickly in order to respond to the instantaneous
requirements of the arc and optimize performance.
By sensing changes in welding current, and hence the
electrode state, the power source will supply varying
output currents to minimize spatter. The Peak and
Background currents are two such current outputs that
can be adjusted.

Wire Feed Speed controls the deposition rate. Peak
Current controls the Arc Length. Background Current
controls the Bead Contour. And Tailout increases
Power in the Arc.

PEAK CURRENT
The Peak Current control acts similar to an “arc pinch”
control. Peak current serves to establish the arc length
and promote good fusion. Higher peak current levels
will cause the arc to broaden momentarily while
increasing the arc length. If set too high, globular type
transfer will occur. Setting this level to low will cause
instability and wire stubbing. In practice, this current
level should be adjusted for minimum spatter and pud-
dle agitation.

Adjust Arc Length with Peak Current

NOTE: In 100% CO

2

shielding gas applications the

peak current level should be set greater than
in a corresponding application using a gas
blend with a high percentage of Argon. Longer
initial arc lengths with 100% CO2 are required
to reduce spatter.

BACKGROUND CURRENT
The Background Current provides the control for the
overall heat input to the weld. Adjusting this level too
high will cause a large droplet to form and globular type
transfer to occur resulting in increased spatter.

Adjusting this level to low will cause wire stubbing and
also poor wetting of the weld metal. This is similar to a
low voltage setting on a standard CV machine

Adjust Bead Shape using Background Current

NOTE: Background Current levels for applications

using 100% CO

2

is less than similar procedures

involving gas blends with high percentages of
Argon. This is a result of the greater heat gen-
erated in the 100% CO

2

arc. (100% CO

2

is 35

volts/cm and 100% Argon is 20 volts/cm. 75%
Argon, 25% CO

2

is about 24 volts/cm.

Contact Tip to Work Distance

HOT START
The Hot Start control can be set to enhance establish-
ing the arc and provide the capability of increasing the
heat at the start of the weld to compensate for a cold
work piece. Hot start adjusts the time that additional
current is applied during the starting of the arc. Refer to
Operational Features and Controls in this section for
a description of this control.

TAILOUT

The tail out provides additional heat without the molten
droplet becoming too large. Increase as necessary to
add “Heat” to the arc without increasing arc length.
(This will allow for faster travel speeds and produce
improved wetting). As tailout is increased, the peal
and/or background current is usually reduced.

WELDING ARC PERFORMANCE

For optimum spatter reduction, the arc should be con-
centrated on the puddle.

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Advertising