Wire feed rolls and guide tubes, Operation – Lincoln Electric LN-8 SVM132-A User Manual

Page 29

Advertising
background image

B-5

OPERATION

B-5

WIRE FEED ROLLS AND GUIDE
TUBES

The drive rolls and guide tube kits are ordered sepa-
rately. Refer to Figure B.3 and install these parts per
the following instructions:

1. Loosen the idle roll spring pressure screw.

2. Remove the drive roll screw and clamping collar

from the drive shaft.

3. Install the drive roll and replace the clamping col-

lar. Tighten the drive roll screw.

4. Remove idle roll shaft screw. Install the idle roll

and idle roll shaft screw.

5. Remove the large ingoing guide from the rear

brass block by loosening the locking screw.

6. Loosen the ingoing guide tube clamping screw.

Install the ingoing guide tube (which is stenciled
“in”) through the rear brass block. Tighten the
clamping screw.

LN-8

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

FIGURE B.3 – WIRE FEED ROLLS AND GUIDE TUBE INSTALLATION

LOCKING

SCREW

OUTGOING

GUIDE TUBE

CLAMPING

COLLAR

DRIVE

ROLL

DRIVE

ROLL

SCREW

INGOING

GUIDE

TUBE

CLAMPING

SCREW

LOCKING

SCREW

LARGE

INGOING

GUIDE

IDLE ROLL

SPRING PRESSURE

SCREW

IDLE

ROLL

IDLE ROLL

SHAFT SCREW

Advertising