Troubleshooting and repair, Repair procedure, Circuit breaker replacement – Lincoln Electric LN-8 SVM132-A User Manual

Page 77

Advertising
background image

F-27

TROUBLESHOOTING AND REPAIR

F-27

REPAIR PROCEDURE

1. Using the 5/16 in. nutdriver,

remove the screws from the left
side cover assembly.

2. Tag and remove the two connec-

tors from the back of the circuit
breaker. Refer to Figure F.8.

3. Using the 9/16 in. wrench, remove

the retaining nut that secures the
circuit breaker to the center panel

on the wire feeder. Remove the
circuit breaker from the wire
feeder.

4. Install the new circuit breaker

through the panel of the control
box. Secure the circuit breaker
with the retaining nut.

5. Install the connectors onto the

back of the circuit breaker at the
positions they were removed from.

6. Install the screws that secure the

left side cover assembly.

CIRCUIT BREAKER REPLACEMENT

(continued)

FIGURE F.8 – CIRCUIT BREAKER AND GROUND LEAD PROTECTOR REPLACEMENT

LN-8

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

Return to Master TOC

CIRCUIT

BREAKER

SCREW

GROUND LEAD

PROTECTOR SWITCH

SWITCH

MOUNT

FLATWASHER

LOCKWASHER

NUT

RETAINING

NUT

Advertising