Power unit installation, Inserting the power unit, Power unit installation -4 – Panasonic 1200N User Manual

Page 120: Inserting the power unit -4

Advertising
background image

Power Unit Installation

Modifications

10-4

Centillion 1200N ATM Switch User Manual

NTP 297-8103-903

Power Unit Installation

This section describes the procedures for installing the power unit.

Inserting the
Power Unit

1.

Make sure the power switch of the power unit that is inserted is turned off.

2.

Remove the front cover from the front of the main unit. Refer to

"Removing

the Front Cover" on page 10-15

.

Figure 10-5: Removing the Front Cover

3.

Insert the power unit into the power unit slot. As the power unit can be made
redundant, there are two slots, left and right. When using only one power unit,
insert the power unit into the slot #0 that is on the left-hand side facing the
main unit. When inserting the power unit, make sure you securely hold the
power unit with both hands (as shown in

Figure 10-6

)and insert it all the way

in until it is secure.

Advertising