Line interface test, Line interface test -19 – Panasonic 1200N User Manual

Page 89

Advertising
background image

Installation

Setting System Configuration Data

Centillion 1200N ATM Switch User Manual

7-19

NTP 297-8103-903

Line Interface
Test

Test the line interface of the line cards installed in the ATM Switch

by entering a

command from the MAT.

1.

Enter the command for performing the line operation test. The command
should be entered as follows:

DISPLAY line[RETURN]

2.

After entering the command, response of the lines for which line cards are
installed is displayed.

3.

Make sure that “GOOD” is the response for all lines for which line cards are
installed. No response is displayed for a line for which no line card is installed.
This completes the operation test. The ATM Switch can now be used properly.

Follow the instructions below when using the equipment in a country or region
where it must conform to EMI VCCI Type 1, FCC Class A, or EN55022 Class A.

Coaxial cable

As shown in the illustration below, install a ferrite core near the connector so
the cable makes a loop.

Figure 7-14: Ferrite Core Installation

RS-232C cable

Use a metal connector

Use a shielded cable

Securely fasten the metal connector to the main unit