ITG engineering guidelines

Enough capacity

For each link,

Table 23 "Computation of link capacity as compared to ITG

load" (page 126)

compares the available link capacity to the additional IP

Trunk 3.01 (and later) load. For example, on link R4-R5, there is plenty
of available capacity (492 kbit/s) to accommodate the additional 24 kbit/s
of IP Trunk 3.01 (and later) traffic.

Table 23
Computation of link capacity as compared to ITG load

Link

Utilization (%)

Incremental

IP Trunk 3.01 (and

later) load

End-

point

s

Capacity

(kbit/s)

Thres

hold

Use

d

Availa

ble

capacity

(kbit/s)

Site pair

Traffic

(kbit/s)

Sufficient

capacity?

R1-R2

1536

80

75

76.8

Santa

Clara/Ottawa

+

Ottawa/Toky

o

21.2

Yes

R1-R4

1536

80

50

460.8

Santa

Clara/Tokyo

+ Santa

Clara/

Richardson

+

Ottawa /

Tokyo

31.4

Yes

R4-R5

1536

80

48

492

Santa

Clara/Richar

dson

+ Ottawa/

Tokyo +

Santa

Clara/Tokyo

31.4

Yes

Some network management systems have network planning modules
that compute network flows in the manner just described. These modules
provide more detailed and accurate analysis, as they can take into account
actual node, link, and routing information. They also help assess network
resilience by conducting link and node failure analysis. By simulating
failures and re-loading network and re-computed routes, the modules
indicate where the network might be out of capacity during failures.