Installing the new water heater (cont’d), Venting (cont’d), Warning – Reliance Water Heaters 606 User Manual

Page 14

Advertising
background image

3

1

2

'

STRAPPING

Installing the New Water Heater (cont’d)

14

Horizontal runs must be securely supported at 3

1

2

foot

intervals and vertical runs supported at 5 foot intervals.

Venting (cont’d)

WARNING

Be sure vent pipe is properly connected to prevent

escape of dangerous flue gases which could cause dead-

ly asphyxiation.

WARNING

Chemical vapor corrosion of the flue and vent system

may occur if air for combustion contains certain chem-

ical vapors. Spray can propellants, cleaning solvents,

refrigerator and air conditioner refrigerants, swimming

pool chemicals, calcium and sodium chloride, waxes,

bleach and process chemicals are typical compounds

which are potentially corrosive.

VENTING THROUGH AN OUTSIDE WALL

A. ALL 75 GALLON MODELS AND 50 GALLON 65,000

BTU/HR MODELS

In the carton is supplied:
1. Two 3

″ inlet and outlet PVC Schedule 40 - 45° vent caps.

2. A 3

″ ABS Schedule 40 - 90 street ell; used to connect the out-

let vent pipe to the water heater when the outlet vent pipe is

to be turned horizontally directly off the blower.

3. A 5‘ section of 3

″ ABS Schedule 40 outlet vent pipe (more may

be required and must be supplied locally).

1. The water heater requires its own (separate) venting

system.

2. Only 3

″ ABS Schedule 40 piping and fittings are accept-

able materials on the first five feet of the outlet vent system.

3. 3

″ PCV, ABS, or CPVC Schedule 40 piping and fittings are

acceptable materials for the inlet vent system and for the

outlet vent system after the first five feet.

4. It cannot be connected to existing vent piping or chimney.
5. When venting through an outside wall, the vents must ter-

minate horizontally to the outdoors.

3

″ PVC SCHEDULE

40 90° STREET

INLET ELBOW

REQUIRED

5' SCHEDULE

40 ABS OUTLET

PIPE SUPPLIED

SCHEDULE

40 PVC INLET PIPE

REQUIRED

ONE 3

″ SCHEDULE

40 PVC 45° OUTLET

ELBOW SUPPLIED

ONE 3

″ SCHEDULE

40 PVC 45° INLET

ELBOW SUPPLIED

3

″ ABS SCHEDULE 40

90° STREET

OUTLET ELBOW

SUPPLIED

B. ALL 40 AND 50 GALLON 40,000 BTU/HR MODELS

In the carton is supplied:

1. Two 3

″ inlet and outlet PVC Schedule 40 - 45° vent caps.

All other piping must be supplied by the supplier.

TWO 3

″ PVC SCHEDULE

40 90° STREET

ELBOW

REQUIRED*

SCHEDULE

40 PVC INLET AND

OUTLET PIPE

REQUIRED

ONE 3

SCHEDULE

40 PVC 45° INLET

ELBOW SUPPLIED

ONE 3

SCHEDULE

40 PVC 45° OUTLET

ELBOW SUPPLIED

1. The water heater requires its own (separate) venting

system.

2. 3

″ PVC, ABS, or CPVC Schedule 40 piping and fittings

are acceptable materials for the vent system on all 40

and 50 gallon models.

3. It cannot be connected to existing vent piping or

chimney.

4. When venting through an outside wall, the vents must

terminate horizontally to the outdoors.

* If making an immediate horizontal run of vent off the

blower, two 3

″ PVC or ABS schedule 40 street elbows

are required

Advertising
This manual is related to the following products: