Operating (cont’d) – Reliance Water Heaters 606 User Manual

Page 22

Advertising
background image

22

Operating (cont’d)

Operating instructions are located on front of the water

heater, above or to one side of the gas control valve. See

page 23.

CHECK FOR LEAKS

Be sure to check all your gas pipes for leaks before operat-

ing your water heater. Use a soapy water solution, not a

match or open flame. Check the factory gas fittings when

the main burner is turned “ON”.

WATER HEATING IGNITION SEQUENCE

(Make sure gas and electric power are connected properly)

1. The ignition control module is powered and monitors the

system, waiting for a call for heat from the thermostat.

2. The thermostat calls for heat by reading a resistance

value within a given range directly proportional to water

temperature.

WARNING

BEFORE OPERATING [PROPANE (L.P.) GAS WATER

HEATERS]: Propane (L.P.) gas is heavier than air. Should

there be a leak in the system, the gas will settle near the

ground. Basements, crawl spaces, skirted areas under

manufactured (mobile) homes (even when ventilated),

closets and areas below ground level will serve as pock-

ets for the accumulation of this gas. Before attempting

to operate the water heater or turning a nearby electri-

cal light switch, be absolutely sure there is no accumu-

lated gas in the area. Search for odor of gas by sniffing

at ground level in the vicinity of the appliance. If odor

is detected, follow the steps indicated at “For Your

Safety” on the cover page of this manual, then leave the

premises.

WARNING

AN ODORANT IS ADDED TO THE GAS USED BY

THIS WATER HEATER.

FOR YOUR SAFETY

IF YOU SMELL GAS:

1. Do not try to light any appliance.

2. Do not touch any electrical switch; do not use any

phone in your building.

3. Immediately call you gas supplier from a neighbor’s

phone. Follow the gas supplier’s instructions.

4. If you cannot reach your gas supplier, call the fire

department.

3. The control module:

a) Checks the pressure switch for an open circuit.

b) Energizes the blower.

c) Checks the pressure switch for a closed circuit to

prove draft.

d) Sends line voltage to the hot surface igniter with a

20-second warm up period.

e) Opens the gas valve and checks the sensing rod for

flame.

4. The burner heats the water to the desired thermostat

setting.

a) The resistance in the thermostat rises to the value

selected by the temperature control knob.

b) The control module closes the gas valve and 5

seconds later, removes power from the blower.

5. Cycle is completed.

CONTROL SEQUENCE - HOT SURFACE DIRECT IGNITION

Pre-purge

5 sec.

HSI Warm-up

20 sec.

Ignition Activation Period

4 sec.

Flame Recognition Period

1sec.

Ignition Trial

4 sec.

Interpurge

5 sec.

Post-purge

5 sec.

Retries

2

Reset from Lockout

1 hr.

Flame Sensing (Nominal)
HSI Off/Run Mode

4.0 µ DC

Advertising
This manual is related to the following products: