1.

Using the center mounting hole shown on the previous page, and below, for the front rail mounting holes, drill an 1-

1/4”

hole through the truck bed.

2.

Let the pilot bit of the hole saw dimple the top of the truck frame. Check to be sure you are above the truck frame.
Check to see that the inside of the frame at this location is clear of any wiring or brake lines. Drill a 21/32” hole through
the top flange of the truck frame.

3.

Insert the long spacer(12), in the hole in the bed. Install the filler spacer(4) as shown in fig. 4 below. Install the short
spacer the(10) as shown below. Set the rail over the spacers and insert the long carriage bolt(9) through the holes.

4.

Install 5/8” serrated washers(13) and 5/8” nuts(14) on the bolts.

5.

Torque all ½” nuts to 75 ft-lb and all 5/8” nuts to 130 ft-lb.

94-01 DODGE 1500 & 94-02 DODGE 2500, 3500 LONG BED AND SHORT BED

CAUTION!

Check for obstructions before drilling. Failure to do so could result in damaged fuel or brake lines, structural members, etc.

Cequent Performance Products, Inc. does its best to communicate tow vehicle manufacturer changes; however, it is ultimately

the responsibility of the installer to prevent damage due to installation.

WASHER(13) AND
NUT(14) BELOW
FRAME FLANGE

CARRIAGE BOLT(9)

LONG SPACER(12)

SHORT SPACER(10)

FILLER SPACER(4))

FILLER SPACER SHOWN ABOVE BED WITH
BOLT IN THIS POSITION

FILLER SPACER SHOWN BELOW BED WITH
BOLT IN THIS POSITION

TRUCK BED

Instructions continued from

previous page.

TRUCK FRAME

Advertising
This manual is related to the following products: