Standard, Non-traditional, Standard 2-7 non-traditional 2-7 – GE Industrial Solutions GPS 4848_100 Users Guide (dual rectifier shelf) User Manual

Page 27: Figure 2-6: non-traditional cabling arrangements, Cabinet cabling options

Advertising
background image

Galaxy Power System 4848/100 with Dual Rectifier Shelf

Issue 5 September 2011

System Description 2 - 7

Cabinet Cabling Options

Standard

Standard cabinets are designed so that ac, battery, and dc load cables are
run through the top of the cabinet.

Non-Traditional

Any of the battery panels and dc load panels (shown in Sections 6 and
7) may be used in cabinets that have non-traditional cabling orientations.
However, only G20, G22, G24, G26, and G27 ac panels (shown in
Section 5) are available for these cabinets (see Figure 2-6). Suffixes of
the ac panels indicate the cabling arrangements listed below:

AC

Panel

Suffix

Cabling Arrangement

AC

Battery and DC Load

A

Through bottom of cabinet

Through bottom of cabinet

B

Through bottom of cabinet

Through top of cabinet

C

Through top of cabinet

Through bottom of cabinet

Note: Check H569-434 for availability.

Figure 2-6: Non-Traditional Cabling Arrangements

AC Input

Battery and
DC Load Leads

AC Input

Battery and
DC Load Leads

AC Input

Battery and
DC Load Leads

"A" Arrangement

"B" Arrangement

"C" Arrangement

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

REMOVE
BEFORE
ADDING
SECOND

RECTIFIER

Advertising