GE Industrial Solutions LP 33U Series 10 & 20 kVA Installation Guide User Manual

Page 17

Advertising
background image

Modifications reserved

Page 17/40

OPM_LPS_3UI_10K_20K_1US_V010.doc

Installation Guide LP 33U Series 10 & 20 kVA / S1

White color =

without any anomaly

Red color

=

anomaly evidence

Fig. 3.6-2 ShockWatch device

Fig. 3.6-3 TiltWatch device

The package of the LP 33U Series
Series
is equipped with
ShockWatch (indicator for shock),
and

TiltWatch (indicator for

overthrow) on the outside.
These devices indicate an eventual
shock or overthrow during
transport.

Whenever these devices show a
possible anomaly, the UPS shall not
be commissioned before
consulting a “Service Center”.

Included in the delivery you can find the following parts:
• An accessories bag.

• CD-ROM connectivity.

• Control Bus cables (only for RPA system).

Adjustable foot to block and support the LP 33U Series

Make use of the 2 adjustable foot, as shown
in the picture, in case you desire to block
the UPS on it’s position.


The height can be adjusted with the 2

enclosed nuts A, taking care however,
that the weight of the UPS remains on the
wheels.

Fig. 3.6-4 Bolts to block the LP 33U Series on it’s position

NOTE !

The wheels are designed
only for limited movements
on the installation site.

NOTE !

A damaged UPS must never be installed or connected to utility or battery!
In case of any damage sustained during the transport, immediately inform the
shipping agent!
A detailed report of the damage is necessary for any indemnity claim.

Packing material recycling
GE
, in compliance with environment protection, use only environmentally
friendly material.
UPS packing materials must be recycled in compliance with all applicable
regulations.

Advertising