Installation Guide LP 33U Series 10 & 20 kVA / S1

UPS 3

OFF

Q1

Q2

ON

OFF

ON

F1 F2

F3

F13 F14

F15

F9 F10

F11

E

E

LPS33U_

010-020_

RPA con

nection_0

1

UPS 4

E

E

UPS 2

LPS33U_

010-020_

RPA con

nection_0

1

OFF

Q1

Q2

F9 F10

F11

UPS 1

ON

OFF

ON

F1 F2

F3

F13 F14

F15

ON

OFF

ON

F1 F2

F3

F13 F14

F15

F9 F10

F11

E

E

LPS33U

_010-020

_RPA con

nection_0

1

OFF

Q1

Q2

LPS33U_

010-020_

RPA con

nection_0

1

OFF

Q1

Q2

ON

OFF

ON

F1 F2

F3

F13 F14

F15

F9 F10

F11

E

E

Fig. 3.9.5-4 Control bus location RPA parallel system


Control bus location RPA parallel system

Place the cables and connect them as indicated in the diagram Fig. 3.9.5-4 following these
procedures:
• Fix the control bus cables with the appropriate tie-wrapE”.
• Place the cables between the parallel units in separated protected conduit to avoid they could

be accidentally interrupted.

• Put in place the front screens B, C and D (Fig. 3.9.5-1) paying attention to not damaging the

control bus cables.




It is important to place the units in sequence of their assigned number.

A unit number from 1 to 4, is defined by the setting of parameters and displayed on the control panel.
This number is also marked inside and outside the packaging.

The standard length of the control bus cable between two parallel unit is 26 ft / 8 m.