Installation Guide LP 33U Series 10 & 20 kVA / S1

3.9.3

External battery connection to LP 33U Series / 10 kVA

Before proceeding to an external battery connection, follow the Safety rules concerning the battery.
Make sure that the UPS is not powered, and remove the external battery protections and the fuses F9,
F10, F11
at the front of the UPS cabinet.

ATTENTION !

Before closing the battery fuses F9, F10 and F11, verify for correct polarity of the
battery connection.

LPS33U_

010-020_

Connectio

n commo

n_01

F9 F10

F11

F1

1

F1

0

F9

-

0

+

-

0

+

Bottom entry cables

Battery block diagram

BATTERY

X1

X2

F9 F10

F11

OFF

ON

OFF

ON

Fig. 3.9.3-1 External battery connection to LP 33U Series / 10 kVA

F9 (+) = Positive pole

F10 (0) = Central point of battery blocks

F11 (-) = Negative pole

NOTE !

Clamp the input battery cables with the included cable-ties