Output signals on voltage-free contacts

On terminals X1 or J2 connector 6 of the following 28 signals can be selected from the display
(access only with password): SETUP / SETUP / LEVEL 2: SERVICE.

0 - No signal

15 - Battery discharge

1 - Buzzer

16 - Manual bypass ON

2 - General alarm (NO)

17 - Rectifier ON

3 - Load on mains

18 - Inverter ON

4 - Stop operation

19 - Battery boostcharge

5 - Load on inverter

20 - Battery earth fault

6 - Mains failure

21 - Battery fault

7 - DC overvoltage

22 - Relay input 1

8 - Low battery

23 - Relay input 2

9 - Overload

24 - Relay output ON

10 - Overtemperature

25 - Relay output OFF

11 - Inverter-mains not syncrony

26 - EPO (Emergency Power Off)

12 - Bypass locked

27 - ECO Mode ON

13 - Bypass mains failure

28 - General alarm (NC)

14 - Rectifier mains failure


Programmable functions on input contacts (X1 - J2)

Some UPS functions can be activated by parameters (access with password only) when an external
NO contact is closed on:

No function

Inverter On

Inverter OFF

Generator ON

Print all

Status relay

Voltage free contacts:

Max. DC / AC: 24 V / 1.25 A
IEC 60950 (SELV circuit)
Min. signal level: 5 Vdc / 5 mA



Gen Set signaling


If an Emergency generator set supplies the UPS in case of utility failure and the generator is particularly

unstable in frequency, it should be suitable to install the signal “generator on” on terminals X1 / 11, 22
(Normally Open voltage-free contact) or on connector J2 / 11, 24 (see Fig. 4.4.1-1 / X1 and J2).
Since the Parameter for of the reading of the Generator function is password protected, call the nearest
Service Center for it's activation.

When this contact closes, it causes the change of certain settable functions such as:

• Enabling or disabling of synchronization and consequently the load transfer to generator.

• The battery recharge inhibition during the generator operation or after what delay from generator

start the battery will start to be recharged.