Burkert Type 8691 User Manual

Page 28

Advertising
background image

28

Electricalinstallation24VDC

Valve connection

Jumper for assignment of Top LEDs

IN 1

IN 2

24 V

Valve

+

-

+

-

Screw terminals

End positions

Screw terminals

Supply 24 V DC

Screw terminals

Valve (control)

ye gn

To

p

Bot

Bot

To

p

Jumper function:

You can set the color assignment of the
end positions with the jumpers.

see chapter
“9.5.2 Device status display - assignment
of the Top LEDs” and
“9.5.3 Change assignment of the Top
LEDs (device status)”

IN 1 = Top (top)
IN 2 = Bot (bottom)

Connection diagram:

Figure 19:

Printed circuit board 24 V DC - cable gland

Check that the seal is correctly positioned in the body casing.

noTe!

Breakage of the pneumatic connection pieces due to rotational impact.

▶ When unscrewing and screwing in the body casing, do not hold the actuator of the process valve but the

connection housing.

Damage or malfunction due to penetration of dirt and humidity.

To ensure degree of protection IP65 / IP67:

▶ Tighten the union nut on the cable gland according to the cable size or dummy plugs used. (ca. 1,5 Nm).

▶ Screw the body casing in all the way.

Tighten union nut on the cable gland (torque approx. 1.5 Nm).

Close the device (assembly tool: 674077

3)

).

Seal
body casing

Body casing

Connection housing

Figure 20:

Position of the seal in the body casing

The teach function can now be used to automatically determine and read in the end positions of the valve
(description of the teach function see chapter “9.4 Teach function (calibrating the end positions)”).

3)

The assembly tool (674077) is available from your Bürkert sales office.

english

Type 8691

Advertising