ZOLL Propaq MD Rev B User Manual

Page 27

Advertising
background image

Propaq MD Overview

9650-0801-01 Rev. B

Propag MD Service Manual

23

8.13 On the Propaq MD unit, press the

CHARGE button.

The unit charges to 50J, the red
Shock button illuminates and a
ready tone sounds.

o

o

8.14 On the Propaq MD unit, press the Shock

button.

8.15 On the Analyzer, observe and record the

energy measurement.

Energy is delivered at 50J. Verify
that the delivered energy is within
15% based on the values in the
table “Delivered Energy at 200J
Defibrillator Setting into a Range
of Loads” on page 25
.

o

o

8.16 On the Propaq MD unit, set energy level to

100J by pressing the Energy Select UP
arrow.

8.17 On the Propaq MD unit, press the

CHARGE button.

The unit charges to 100J, the
Shock button illuminates and a
ready tone sounds.

o

o

8.18 On the Propaq MD unit, press the Shock

button.

8.19 On the Analyzer, observe and record the

energy measurement.

Energy is delivered at 100J.
Verify that the delivered energy is
within 15% based on the values in
the table “Delivered Energy at
200J Defibrillator Setting into a
Range of Loads” on page 25.

o

o

8.20 On the Propaq MD unit, set energy level to

200J by pressing the Energy Select UP
arrow.

8.21 On the Propaq MD unit, press the

CHARGE button.

The unit charges to 200J, the red
Shock button illuminates and a
ready tone sounds.

o

o

8.22 On the Propaq MD unit, press the Shock

button.

8.23 On the Analyzer, observe and record the

energy measurement.

Energy is delivered at 200J.
Verify that the delivered energy is
within 15% based on the values in
the table “Delivered Energy at
200J Defibrillator Setting into a
Range of Loads” on page 25.

o

o

8.24 On the Propaq MD unit, press the

CHARGE button.

The unit charges to 200J, the red
Shock button illuminates, and a
ready tone sounds.

o

o

Do This...

Observe This...

Pass/Fail

Advertising