ZOLL Propaq MD Rev B User Manual

Page 74

Advertising
background image

70

9650-0801-01 Rev B

14

Tilt side panel to access the EtCO

2

connector and use an orange stick release
the tabs and remove the EtCO

2

connector.

15

Remove the EtCO2 module from the unit.

16

Remove three (3) screws from the outside
of the left side panel in the areas illustrated.

Note: During reassembly, torque screws to
6 in-lbs.

17

Remove four (4) screws from the inside top
of the left side panel in the areas illustrated
and carefully pull out side panel.

Note: During reassembly, torque screws to
6 in-lbs.

18

Remove ECG ZIF connector in the area
illustrated.

19

Remove the left side panel from the unit.

EtCo

2

connector

before removal

EtCo

2

connector

after removal

EtCO2 connector after removal

Advertising