Removing the etco2 and nibp modules, Removing the etco, And nibp modules – ZOLL Propaq MD Rev B User Manual
Page 71
Removing the EtCO2 and NIBP Modules
9650-0801-01 Rev B
ZOLL Propaq MD Service Manual
67
Removing the EtCO
2
and NIBP Modules
Tool Required
•
# 1 Phillips screwdriver with torque capability
•
orange (wooden) stick
Setup
•
This procedure should be conducted on a static mat.
•
Wear a wrist strap to ground during the procedure.
•
Complete these procedures in the following order before performing this procedure:
1.
“Removing the Handle” on page 57
2.
“Removing the Printer Module” on page 58
3.
“Disassembling the Main Unit” on page 60
4.
“Removing the Front Enclosure Module” on page 63
5.
“Removing the Monitor Board and SpO2 Modules” on page 71
Note:
After replacing the EtCO2 and/or NIBP modules, see Chapter 4, "Resetting Life Cycle
Counters" to reset the life cycle counters for the module(s) that you have replaced.
To assemble the EtCO
2
and/or NIBP modules, reverse the steps.
EtCO
2
and/or NIBP Disassembly
1
Remove the right side panel (containing
temperature, IBP, and USB connectors) by
removing four (4) screws from inside the
unit.
Note: During reassembly, torque screws to
6 in-lbs.
2
Remove three (3) screws from underneath
and outside the unit.
Note: During reassembly, torque screws to
6 in-lbs.