0 nibp leak test, Nibp leak test – ZOLL Propaq MD Rev B User Manual

Page 43

Advertising
background image

Propaq MD Overview

9650-0801-01 Rev. B

Propag MD Service Manual

39

19.0 NIBP Leak Test

Equipment

Dual lumen NIBP hose, stop watch, NIBP simulator

Do This...

Observe This...

Pass/Fail

19.1 Turn on the Propaq MD unit.

Note: If the unit is in AED mode, press
the Manual quick access key to go into
manual mode.

19.2 Connect a dual lumen hose from the NIBP

simulator to the NIBP port of the Propaq
MD.

19.3 On the Propaq MD unit, do the following

to enter the NIBP Test control panel:

Press the More (

) then the Setup

(

) quick access keys.

Use the navigation keys to select
Supervisor>Service>Device
Tests
>NIBP Test.

Note: You need a supervisor passcode to
enter the Supervisor menu.

19.4 From the Propaq MD NIBP Test control

panel, use the navigation keys to select:

Close Valve

Turn Pump On

19.5 Monitor the pressure reported by the

external pressure standard.

19.6 Once the pressure reaches the target

pressure of 250 +/- 5 mmHg, use the
navigation keys to select Turn Pump Off.

19.7 Allow the system to stabilize for at least

10 seconds.

19.8 Select Mark P1 to mark the starting

pressure. Wait 15 seconds, then select
Mark P2.

19.9 From the NIBP Test control panel, select

Open Valve to release the pressure.

19.10 Calculate the leak rate: L = P1 - P2.

Reading should be=<5 mmHg

o

o

19.11 From the NIBP Test control panel, select

Clear.

Advertising