Edwards Signaling EBPS Remote Booster Power Supply User Manual

Page 51

Advertising
background image

Remote Booster Power Supply Technical Reference Manual

45

Figure 24: BPSs connected in parallel with sense circuits

1

2

3

4

5

6

7

8

9

10 11 12 13

(1)

(2)

(6)

(7)

(5)

(3)

(4)

(6)

(7)

(6)

(7)

(6)

(7)

(6)

(7)

(1)

On Sense Off

(2) Output booster 1
(3)

Output booster 2

(4) Output booster 3
(5) Output

booster

n

(6) Visible
(7) Audible

Sync diagram key

Strobe flash

Audible tone

Four-second delay of outputs (temporal setting)

Note:

Four-second delay operation does not comply with UL 864 9th edition.

In Figure 25 all visible and audible circuits are synchronized with a four second
output activation delay when the BPSs are connected in parallel through their
sense circuits.

Note:

Delay time is controlled by DIP switch SW1-4. See “Setting the DIP

switches” for more information.

Figure 25: BPSs connected in parallel with sense circuits

1

2

3

4

5

6

7

8

9

10 11 12 13

(1)

(2)

(3)

(4)

(5)

(4)

(5)

(4)

(5)

(1)

On Sense Off

(2) Output booster 1
(3)

Output booster 2

(4) Visible
(5) Audible

Sync diagram key

Strobe flash

Audible tone

Advertising