Recalibration Procedure

Recalibration is carried out in five phases as shown in the table below; each phase
corresponds to a basic input type.

CAUTION:

The 50mV phase MUST be calibrated before the thermocouple range.

Table 27. Input Calibration phases

DC milli-volt Calibration

50 mV

DC voltage Calibration

10 V

DC milliamps Calibration

20 mA

RTD Calibration

200 ohm

Thermocouple Calibration

K type source at 0ºC

1. During the instrument’s power-up “splash screen”, press

and

together until the

Calibration Status screen is displayed.

2. Press

to select the first calibration phase (50mV Calibration)

3. Ensure that an accurate 50mV signal has been applied to terminals 2 (+ve) and 3 (-ve),

then press

+

to initiate the calibration.

4. During calibration the message “50mV DC Input Calibrating” will display for a few

seconds. This should be followed by the “Calibration Successful” confirmation.

5. If the input is misconnected or an incorrect signal is applied, the calibration will be aborted

and the display will show “Failed: Signal Too Large! or Failed: Signal Too Large!”. The
previous calibration value will be retained.

6. Press

to select the next calibration phase.

7. Repeat this process for each input type until all the phases are calibrated. For each phase,

ensure that the correct input is applied, using the correct connections.

8. Once all calibration phases are completed, recorder versions will display the Calibration

Reminder Date. If required, this can be changed to the date of you next calibration check.
Ensure that Calibration Reminders are enabled in Input Configuration to receive a
reminder.

9. Press

+

to exit to the main menu.

Note:

Calibration Mode automatically exits if there is no button activity for two minutes.