Service reference manual sequence of operations – Armstrong World Industries HWC PREMIER 183 User Manual

Page 19

Advertising
background image

Service Reference Manual

SEQUENCE OF OPERATIONS

2-9

SRM-HW/HWC 2/99

6.

After the 90-second delay, the

ignition control

de-

energizes the cooling speed relay and the

circulat-

ing air blower

stops.

FAN ON

1.

When the

thermostat

is switched to the “FAN ON”

position, the

R-G

circuit sends a 24-volt signal to

pin 4 of the 5-pin thermostat harness.

2.

The 24-volt signal energizes the cooling speed
relay, sending L1 power to the

ACB COOL

terminal

of the

ignition control

.

3.

L1 power is sent to the

circulating air blower

terminal block, causing the

circulating air blower

to run in cooling speed.

4.

The

circulating air blower

continues to run in

cooling speed until the

thermostat

is switched to

“AUTO”, interrupting the

R-G

circuit.

Note: With the

thermostat

in the “FAN ON” position

during heat call,

ignition control

will not energize

the heat speed relay. The

circulating air blower

continues to run in cooling speed unless the

limit

switch

circuit opens, which would cause the heat

speed relay and the

induced draft blower

relay

to become energized. This would de-energize the
cooling speed relay until either the

limit switch

circuit is closed or the

thermostat

is switched to

the “AUTO” position.

Advertising