Bryant 2-stage Deluxe Induced-Combustion 4-way Multipurpose 120 User Manual

Page 29

Advertising
background image

29

The Chimney Adapter Kit is a listed alternative venting system
for these furnaces. See the kit instructions for complete details.
Canada (and U.S.A.)--This furnace is permitted to be vented into
a clay tile--lined masonry chimney that is exposed to the outdoors

below the roof line, provided:

1. Vent connector is Type--B double--wall, and
2. This furnace is common vented with at least 1 draft

hoodequipped appliance, and

3. The combined appliance input rating is less than the

maximum capacity given in Table 8, and

4. The input rating of each space heating appliance is greater

than the minimum input rating given in Table 9 for the

local 99% Winter Design Temperature. Chimneys having
internal areas greater than 38 square inches require furnace
input ratings greater than the input ratings of these

furnaces. See footnote at bottom of Table 9, and

5. The authority having jurisdiction approves.

If all of these conditions cannot be met, an alternative venting
design shall be used, such as the listed chimney adapter kit with a

furnace listed for use with the kit, a listed chimney--lining system,
or a Type--B common vent.
Inspections before the sale and at the time of installation will

determine the acceptability of the chimney or the need for repair
and/or (re)lining. Refer to Fig. 35 to perform a chimney

inspection. If the inspection of a previously used tile--lined
chimney:

a. Shows signs of vent gas condensation, the chimney

should be relined in accordance with local codes and the

authority having jurisdiction. The chimney should be
relined with a listed metal liner, Type--B vent, or a listed

chimney adapter kit shall be used to reduce condensation.
If a condensate drain is required by local code, refer to
the NFGC, Section 10.9 for additional information on

condensate drains.

b. Indicates the chimney exceeds the maximum permissible

size in the tables, the chimney should be rebuilt or relined
to conform to the requirements of the equipment being
installed and the authority having jurisdiction.

A chimney without a clay tile liner, which is otherwise in good
condition, shall be rebuilt to conform to ANSI/NFPA 211 or be

lined with a UL listed (ULC listed in Canada) metal liner or UL

listed Type--B vent. Relining with a listed metal liner or Type--B
vent is considered to be a vent--in--a--chase.
If a metal liner or Type--B vent is used to line a chimney, no other
appliance shall be vented into the annular space between the

chimney and the metal liner.
Exterior Masonry Chimney FAN + NAT
Installations with Type--B Double--Wall Vent
Connectors
ENFPA & AGA

Table 8 – Combined Appliance Maximum Input Rating in

Thousands of BTUH per Hour

VENT HEIGHT

(FT)

INTERNAL AREA OF CHIMNEY

(SQ. IN.)

12

19

28

38

6

74

119

178

257

8

80

130

193

279

10

84

138

207

299

15

NR

152

233

334

20

NR

NR

250

368

30

NR

NR

NR

404

Table 9 – Minimum Allowable Input Rating of Space--Heat-

ing Appliance in Thousands of BTUH per Hour

VENT HEIGHT

(FT)

INTERNAL AREA OF CHIMNEY

(SQ. IN.)

12

19

28

38

Local 99% Winter Design

Temperature: 17 to 26_F

6

0

55

99

141

8

52

74

111

154

10

NR

90

125

169

15

NR

NR

167

212

20

NR

NR

212

258

30

NR

NR

NR

362

Local 99% Winter Design

Temperature: 5 to 16_F*

6

NR

78

121

166

8

NR

94

135

182

10

NR

111

149

198

15

NR

NR

193

247

20

NR

NR

NR

293

30

NR

NR

NR

377

Local 99% Winter Design

Temperature: ---10 to 4_F*

6

NR

NR

145

196

8

NR

NR

159

213

10

NR

NR

175

231

15

NR

NR

NR

283

20

NR

NR

NR

333

30

NR

NR

NR

NR

Local 99% Winter Design

Temperature: ---11_F or lower

Not recommended for any vent configuration.

*The 99% Winter Design Dry---Bulb (db) temperatures are found in the

1993 ASHRAE Fundamentals Handbook, Chapter 24, Table 1 (United

States) and 2 (Canada), or use the 99.6% heating db temperatures found

in the 1997 or 2001 ASHRAE Fundamentals Handbook, Climatic Design

Information chapter, Table 1A (United States) and 2A (Canada).

APPLIANCE APPLICATION REQUIREMENTS
Appliance operation has a significant impact on the performance
of the venting system. If the appliances are sized, installed,

adjusted, and operated properly, the venting system and/or the
appliances should not suffer from condensation and corrosion.

The venting system and all appliances shall be installed in

accordance with applicable listings, standards, and codes.
The furnace should be sized to provide 100% of the design

heating load requirement plus any margin that occurs because of
furnace model size capacity increments. Heating load estimates

can be made using approved methods available from Air

Conditioning Contractors of America (Manual J); American
Society of Heating, Refrigerating, and Air--Conditioning

Engineers; or other approved engineering methods. Excessive
over--sizing of the furnace could cause the furnace and/or vent to

fail prematurely. When a metal vent or metal liner is used, the

vent must be in good condition and be installed in accordance
with the vent manufacturer’s instructions.
To prevent condensation in the furnace and vent system, the
following precautions must be observed:

1. The return--air temperature must be at least 60_F db except

for brief periods of time during warm--up from setback at

no lower than 55_F (13_C) db or during initial start--up
from a standby condition.

2. Adjust the gas input rate per the installation instructions.

Low gas input rate causes low vent gas temperatures,

312A

Advertising