Sunnex PF Series (MRI) User Manual

Page 12

Advertising
background image

Sunnex PF Series MRI Service & Installation Manual

12


Option 2 – Installing the transformer box inside the MRI room.

The light is equipped with 30ft of cord on the secondary side and 10ft of cord
on the primary side. The total length of cord on the secondary side should not
be altered from the original 30ft.

1. Mount electrical box securely to a structural member on the floor outside

of the safe perimeter (100 Gauss line/10mT) of MRI machinery with a
bolt 1/2" diameter x 2" L. (Four holes are provided on the base plate of
transformer box).

2. It is recommended not to mount the electrical box on wall.
3. Velcro is provided on the base plate of the electrical box and a rope and

snap-on hook is provided on the electrical box to assist in proper
installation.

4. Plug lamp lead connector into the receptacle on the side of the electrical

box. CAUTION: Lamp lead connector has a mechanical latch. Be sure
lamp connector is fully engaged into electrical box receptacle and the
latch is fully engaged. (To disconnect, press lever on the receptacle and
pull the lamp head connector.)



Figure 4. Lamp lead connection with electrical box



5. Plug electrical box lead into a hospital grade electrical socket.
6. Lamp is ready for use.


CAUTION! THE ELECTRICAL BOX CONTAINS FERROUS MATERIALS
AND MUST BE HANDLED WITH CAUTION. THE TRANSFORMER BOX

Lamp head

connector

Electrical

box

Advertising