Shipping carton & contents – Sunnex PF Series (MRI) User Manual

Page 3

Advertising
background image

Sunnex PF Series MRI Service & Installation Manual

3

1. SHIPPING CARTON & CONTENTS

PF28016-M (mobile)

• One lamp arm assembly with 30 feet cord and connector

• One caster base with 5 wheels

• One base weight with 5/16-18 x 2 ½ socket head cap screw

• One vertical pole with set screw

• One electrical box with lead and cord plug

• Two Allen keys; 3/32 and 6mm (the keys are magnetic)

• Two cord hooks (off-white) to hold output cord to the pole

• A combination of installation guide/instruction manual


The electrical box is packaged and shipped with the light.

*Carefully check the contents of the shipment. Report shortages and/or
errors, to Sunnex or your dealer's customer service department, within five
(5) working days.

The recovery of costs related to shipping damage, concealed or otherwise,
can be a long and frustrating experience. In order to avoid the uncomfortable
aspects, all freight claims by either the dealer or consignee should be filed
with the transportation company within five (5) working days. The carton and
its inserts should be kept for inspection by the transportation company.

CAUTION: Please be aware, if this routine is not followed, and the carton
and its contents are disposed of or destroyed before inspection by the
transportation company, our assistance is of no value to you.

Advertising