Interconnecting terminal base units, Panel/wall mounting – Rockwell Automation 1440-RMA00-04RC XM-440 Master Relay Module User Manual

Page 23

Advertising
background image

Rockwell Automation Publication GMSI10-UM009D-EN-P - June 2011

Installing the XM-440 Master Relay Module 23

Interconnecting Terminal Base Units

Follow the steps below to install another terminal base unit on the DIN rail.

1. Position the terminal base on the 35 x 7.5mm DIN rail (A).

2. Make certain the side connector (B) is fully retracted into the base unit.

3. Slide the terminal base unit over tight against the neighboring terminal

base. Make sure the hook on the terminal base slides under the edge of
the terminal base unit.

4. Press down on the terminal base unit to lock the terminal base on the

DIN rail. If the terminal base does not lock into place, use a screwdriver
or similar device to open the locking tab, press down on the terminal
base until flush with the DIN rail and release the locking tab to lock the
base in place.

5. Gently push the side connector into the side of the neighboring terminal

base to complete the backplane connection.

Panel/Wall Mounting

Installation on a wall or panel consists of:

• laying out the drilling points on the wall or panel
• drilling the pilot holes for the mounting screws
• installing the terminal base units and securing them to the wall or panel

IMPORTANT

Make certain you install the terminal base units in order of
left to right.

Advertising