4 connecting the tubing, Connecting the tubing, Connection to injection valve – Metrohm 818 IC Pump User Manual

Page 17: Fig. 5, Ction 2.4, 2821.120 filter unit peek 24 supplied (see

Advertising
background image

2.4 Connecting the tubing

818 IC Pump / 8.818.1023 Instructions for Use

11

2.4 Connecting

the

tubing

2.4.1

Connection to injection valve

It is recommended to use 6.1831.010 PEEK capillaries, a 6.2620.150

Pulsation dampener (see section 2.3.2), and a Filter unit PEEK (see

section 2.3.3) to connect the 818 IC Pump to the injection valve of the

820 IC Separation Center. Proceed as follows:

Fig. 5:

Connection to injection valve

3 Connection capillary

to 820 IC Separation Center.

PEEK capillary (6.1831.010)


24 Filter unit PEEK (6.2821.120)

25 Pulsation dampener (6.2620.150)

1 Connection to 818 IC Pump

Cut connection capillary 3 (6.1831.010 PEEK capillary) to the

required length and equip it with compression fittings.

Attach connection capillary 3 to the upper connection of the

purge valve (see Fig. 1).

2 Connection of filter unit PEEK

Attach the other end of connection capillary 3 at the filter

housing 21 of the filter unit 24 (see Fig. 4).

Connect a PEEK capillary 6.1831.010 cut to the required

length and equipped with connectors to the filter connector

23 of the filter unit 24.

3 Installation of the capillary in the IC Separation

Center

Procedure, see 819/820 Instructions for Use.

4 Connection of the pulsation dampener

Procedure, see section 2.3.2.

5 Connection to the injection valve

Procedure, see section 2.3.3.

25

24

3

818

820

Advertising