5 validation / glp – Metrohm 709 IC Pump User Manual

Page 44

Advertising
background image

4 Notes – Maintenance – Faults

709 IC Pump

36

4.5

Validation / GLP

The requirements of GLP (Good Laboratory Practice) include a peri-

odic check of analytical measuring instruments with regard to their re-

producibility and accuracy using Standard Operating Procedures,

SOP).
The 709 IC Pump as part of the complete ion chromatography system,

whose most important components also include separating column,

732 IC Detector, 733 IC Separation Center, and evaluation system,

must be incorporated in its comprehensive validation.
Testing of the electronic and mechanical function groups of Metrohm

instruments can and should be performed as part of a regular service

by trained personnel of the manufacturing company (see section 4.2.1).

All Metrohm instruments are equipped with start-up-test routines which

check for perfect functioning of the relevant assemblies when the in-

strument is switched on. If no error message is displayed, it may be as-

sumed the instrument is operating without faults.
The Metrohm company also supplies its instruments with an integrated

diagnostic program (see section 4.4) which, in the case of possible

malfunctions or faulty behavior, allows the user to check the functioning

of certain assemblies and localize the fault. Diagnostic programs can

also be integrated in a validation procedure.

Advertising