Installation, cont – Cardinal Industries 225 WEIGHT INDICATOR User Manual

Page 14

Advertising
background image

INSTALLATION, CONT.

4. With the load cell cable routed into the enclosure, refer to Figure No. 4 and then remove

approximately 5 to 6 inches of the cable outer insulating jacket exposing the internal wires.

5. Next, cut the shield wire so that it extends past the outer jacket approximately 3/4 inch.

6. Now, remove 1/4 inch of insulation from the end of each of the 4 wires (without sense

leads) or 6 wires with sense leads.

1/4 inch

5 to 6 inches

Figure No. 4

3/4 inch

7. Referring to the table below (or on the circuit board) for terminal connections, connect each

wire to terminal block P13. Refer to Figure No. 11 for terminal block location.

LOAD CELL CONNECTOR P13

U

PIN NO.

U

U

Function

U

U

PIN NO.

U

U

Function

U

1

+ EXCITATION

5

- SIGNAL

2

+ SENSE

6

- SENSE

3

+ SIGNAL

7

- EXCITATION


8. To terminate a wire, use a small flat blade screwdriver and press down on the release bar

for the terminal. Insert the wire into the opening and remove the screwdriver, allowing the
release bar to return to its original position, locking the wire in place. See Figure No. 5.

Press
Down

Insert
Wire

Figure No. 5

8200-M538-O1

y 225 Installation

Page 10

Advertising