Upflow installations top vent, See fig. 11), 58h d v – Carrier DIRECT VENT 4 58HDV User Manual

Page 18

Advertising
background image

18

Drain Tube
Corrugated

5

/

8

″″ (15.9mm) ID &

Clamps

IN
L

E

T

EXHAUST

IN

ON

OFF

VENT

Drain Tube
Black Rubber

1

/

2

(12.7mm) ID &

Clamps

AIR

FL

O

W

Street Elbow

1

/

2

(12.7mm) CPVC

(Loose parts bag)

Casing Grommet
Black Rubber

(15.9mm) ID

(Loose parts bag)

Drain Tee

Drain Connector Black PVC

3

/

4

(18.1mm) PVC X

1

/

2

(12.7mm) CPVC (Loose
parts bag)

Drain Line Vent Tee

3

/

4

(18.1mm) PVC or

1

/

2

(12.7mm)

CPVC (Field supplied)

Relief Tube
Black Rubber

3

/

16

(4.8mm) ID

Coupling & Clamps
(Optional)

25--24--67

Single Pressure Switch

Dual Pressure Switch Detail

Drain Tube Black Rubber

5

/

8

(15.9mm) ID &

Clamps, Cut length to fit (Loose parts bag)

On Some Models
ONLY

Plastic Caps (2)
Yellow or black

Vent Drain
& Clamps

Representative drawing only, some models may vary in appearance.

A07706

Fig. 11 -- Upflow Installations Top Vent

Upflow Installations Top Vent

(See Fig. 11)

Remove knockout from the side of the furnace casing where drain
tube will exit.
Install casing grommet [black rubber

5

/

8

″ (15.9mm) ID grommet --

in loose parts bag].
Install the

1

/

2

″ (12.7mm) CPVC street elbow on discharge of trap

Install the black PVC tube connector [

3

/

4

″ (18.1mm) PVC x

1

/

2

(12.7mm) CPVC from loose parts bag] as shown in the illustration

above.
Cut the black drain tube [

5

/

8

″ (15.9mm) ID -- in loose parts bag] to

length to fit between trap and tube connector through grommet.
Clamp both ends of the drain tube using clamps provided.

Glue the CPVC street elbow to the trap using appropriate cleaner
and solvent cement.
The field supplied

3

/

4

″ (18.1mm) PVC or

1

/

2

″ (12.7mm) CPVC

drain line vent tee must vent outside the furnace cabinet (see

exploded view above).
Note:

It is recommended that all PVC piping and fitting

connections be fit up and inspected before final cementing. Trap

must be primed before operation. Verify all condensate drain
connections are securely clamped. A coupling and clamps (in loose

part bag) may be installed as shown for future servicing of the vent

system.

NOTE: “PVC” is used as a generic term. Pipe and fitting materials used must be acceptable to the local code officials hav-

ing jurisdiction.

58H

D

V

Advertising